Elstree Substation

Detailed design for new and extended GIS substation infrastructure. PRP undertook the detailed design of a new 132kV GIS substation building and the extension to an existing 400kV GIS building. Other detailed design covered retaining walls, SGT bunds, equipment bases, cable troughs, drainage and hardstanding.

Project Summary

PRP undertook the detailed design of a new 132kV GIS substation building and the extension to an existing 400kV GIS building. Other detailed design covered retaining walls, SGT bunds, equipment bases, cable troughs, drainage and hardstanding.

Final Results

PRP delivered detailed engineering design drawing on experience in civil, structural, architectural and M&E works for complex power infrastructure projects.

At a Glance

Project Type GIS substation and extension
Power Scope 132kV and 400kV
Design Scope Detailed design
Key Features Retaining walls, SGT bunds, cable troughs and drainage