Detailed design for a flood-sensitive onshore wind farm substation. PRP carried out the detailed design of the 275kV GIS substation at Hedon including buildings, enabling works, drainage, equipment foundations, roads and hardstanding. The building was elevated due to being located on a flood plain. All civil, structural, architectural and M&E works were designed in house.
PRP carried out the detailed design of the 275kV GIS substation at Hedon including buildings, enabling works, drainage, equipment foundations, roads and hardstanding. The building was elevated due to being located on a flood plain. All civil, structural, architectural and M&E works were designed in house.
PRP delivered detailed engineering design drawing on experience in civil, structural, architectural and M&E works for complex power infrastructure projects.
| Project Type | Onshore substation |
| Voltage | 275kV GIS |
| Location | Hedon |
| Key Features | Elevated building on a flood plain |





Interested in our services, please contact our team.
Contact Us© Patterson Reeves & Partners . Registered Number 04450543
Website Design Bournemouth by Ben Web Design