Converter station engineering with proven construction cost savings. PRP worked at both converter stations. Our inputs included the assessment and re-design of existing over designed foundations, saving over £1m in construction costs. Other input was the detailed design of buildings, bunds, roads, drainage, shore protection, fencing and ductwork along with technical support throughout the project.

Project Summary

PRP worked at both converter stations. Our inputs included the assessment and re-design of existing over designed foundations, saving over £1m in construction costs. Other input was the detailed design of buildings, bunds, roads, drainage, shore protection, fencing and ductwork along with technical support throughout the project.

Final Results

The project delivered measurable value through the assessment and re-design of over designed foundations, saving over £1m in construction costs.

At a Glance

Project Type Converter stations
Locations Hunterston and Flintshire Bridge
Key Outcome Over £1m saving in construction costs
Design Scope Buildings, bunds, roads, drainage, shore protection and ductwork